A
anovak
OK, folks. Here's something strange and I just can't figure it out....
In the past I have been manually publishing a Resource Usage View
report via MS Project Pro 2003, showing assignments by resource
FILTERING out assignments that are 100% complete. Fine and dandy,
however....
Now I'm trying to replace that report with "live" access to the
Assignments View via PWA (I've got the timesheets turned off--we won't
be using them).
Well basically there are several assignments that are still listed for
these resources in the assignment view in PWA that I have VERIFIED are
set at 100% in % work complete in the Task Usage View via MS Project
Pro AND their "parent" tasks are all set to 100%. Most are milestones
but some are not. But they don't show up in the Resource Usage manual
report,even with the same filter.
What in the heck is going on? I hope the PWA Assignment View isn't
going off the timesheet (which we aren't using). What can I do to make
the PWA Assignments View match the Resource Usage View in MS Project
Pro with the same filter (% Complete not equal 100%)?
I would greatly appreciate the help on this. I'm not sure what to
think.
Thanks,
Andy Novak
University of North Texas
In the past I have been manually publishing a Resource Usage View
report via MS Project Pro 2003, showing assignments by resource
FILTERING out assignments that are 100% complete. Fine and dandy,
however....
Now I'm trying to replace that report with "live" access to the
Assignments View via PWA (I've got the timesheets turned off--we won't
be using them).
Well basically there are several assignments that are still listed for
these resources in the assignment view in PWA that I have VERIFIED are
set at 100% in % work complete in the Task Usage View via MS Project
Pro AND their "parent" tasks are all set to 100%. Most are milestones
but some are not. But they don't show up in the Resource Usage manual
report,even with the same filter.
What in the heck is going on? I hope the PWA Assignment View isn't
going off the timesheet (which we aren't using). What can I do to make
the PWA Assignments View match the Resource Usage View in MS Project
Pro with the same filter (% Complete not equal 100%)?
I would greatly appreciate the help on this. I'm not sure what to
think.
Thanks,
Andy Novak