C
carf4F
Hello,
1. I want to assign a single keyboard shortcut for changing the level
of subtask instead of project->outline->indent. How can I do this?
2. I want to change the level of tasks: suppose I have task A and set
task B to be a subtask of A. Now I want to set B to have the same level
with A. How can I do this?
Best regards,
1. I want to assign a single keyboard shortcut for changing the level
of subtask instead of project->outline->indent. How can I do this?
2. I want to change the level of tasks: suppose I have task A and set
task B to be a subtask of A. Now I want to set B to have the same level
with A. How can I do this?
Best regards,