M
maryann
Hi - I see a widespread discrepency between the "Last
Published" and "Last modified" date stamps in our project
set.
If we have the collaborate options of: 'on every save ,
publish the following information to project server' (all
checkboxes selected), shouldn't these two time stamps be
the same -- or at least whenever the Save option was used?
What if someone only chooses Collaborate->Publish->All
Information, does that also not alter the modify stamp?
thanks
Published" and "Last modified" date stamps in our project
set.
If we have the collaborate options of: 'on every save ,
publish the following information to project server' (all
checkboxes selected), shouldn't these two time stamps be
the same -- or at least whenever the Save option was used?
What if someone only chooses Collaborate->Publish->All
Information, does that also not alter the modify stamp?
thanks