E
Earl
Typically when I level I open all projects where my resources have tasks. I
am trying to minimize the number of projects I have to open so here is an
example and question.
I have a resource that is in two projects (A and B). In project A he does
not have any incomplete tasks. So when I level B I do not believe I need to
have A open. After leveling when I look at the resource sheet or usage the
icon is colored red. As soon as I open A, it turns black.
I am assuming this is just a nuance of project server and not indicative of
a problem. It has to be red because at that point it doesn't know anything
about tasks in that schedule.
am trying to minimize the number of projects I have to open so here is an
example and question.
I have a resource that is in two projects (A and B). In project A he does
not have any incomplete tasks. So when I level B I do not believe I need to
have A open. After leveling when I look at the resource sheet or usage the
icon is colored red. As soon as I open A, it turns black.
I am assuming this is just a nuance of project server and not indicative of
a problem. It has to be red because at that point it doesn't know anything
about tasks in that schedule.