R
Robert11
Hello:
Have a chart made from a table that has bolood pressure readings as a
function of dates.
Some dates are skipped.
The chart generated now connects a line between all the dates points that
are there, sequentially,
irrespective of whether there are points for all the (daily) dates.
Is it possible for the generated chart to have the line missing for dates
for which there is no data, and then to resume connecting the dots between
actual data ponts ?
Graph looks funny for data points connected for each day, which is what I
want of course, and then a line connecting two points perhaps a week apart
(for when on vacation with no data).
Thanks,
Bob
Have a chart made from a table that has bolood pressure readings as a
function of dates.
Some dates are skipped.
The chart generated now connects a line between all the dates points that
are there, sequentially,
irrespective of whether there are points for all the (daily) dates.
Is it possible for the generated chart to have the line missing for dates
for which there is no data, and then to resume connecting the dots between
actual data ponts ?
Graph looks funny for data points connected for each day, which is what I
want of course, and then a line connecting two points perhaps a week apart
(for when on vacation with no data).
Thanks,
Bob