I wasn't sure which category to use for this one.
If I'm using Access 2003
I have a DB that I use for tracking all our company instruments. They all
get calibrated. Let's say I have a field for "Calibration Due Date" and the
date is 11/18/05. Is there any way of flagging that field and be able to
link this field with Outlook and the neccessay people will be notified 5 days
prior that the instrument is due for calibration? Which would be 11/13/05?
Thank you
If I'm using Access 2003
I have a DB that I use for tracking all our company instruments. They all
get calibrated. Let's say I have a field for "Calibration Due Date" and the
date is 11/18/05. Is there any way of flagging that field and be able to
link this field with Outlook and the neccessay people will be notified 5 days
prior that the instrument is due for calibration? Which would be 11/13/05?