C
confused
I have 2 workbooks linked - when I insert a row in the source workbook the
destination workbook does not update (even when I do an update).
ex. cell A2 in workbook 1 is linked to show up in cell c5 in workbook 2
but I need to insert a row above A2 so A2 becomes A3 but then in workbook 2
= cell c5 still points to A2 instead of updating to A3.
is there a way around this?
destination workbook does not update (even when I do an update).
ex. cell A2 in workbook 1 is linked to show up in cell c5 in workbook 2
but I need to insert a row above A2 so A2 becomes A3 but then in workbook 2
= cell c5 still points to A2 instead of updating to A3.
is there a way around this?