S
Steve Scott
I have developed an access database that reviews MS project data but the
trouble is I have to export the project data from MS Project into Excel then
load the spreadsheet into the access database. Is there anyway I can get the
access mdb to directly link to the project mpp without having to do anything
else?
Thanks in advance.
trouble is I have to export the project data from MS Project into Excel then
load the spreadsheet into the access database. Is there anyway I can get the
access mdb to directly link to the project mpp without having to do anything
else?
Thanks in advance.