D
DDBeards
I maintain two environments; one for development and one for production. Is
there a way to automatically update the Link Table? I have 20 tables linked
to 4 different mdf, during development I point to the development files and
then when I copy to production I must relink to production. I would like to
run a macro and do this automatically.
Thanks
Chris
there a way to automatically update the Link Table? I have 20 tables linked
to 4 different mdf, during development I point to the development files and
then when I copy to production I must relink to production. I would like to
run a macro and do this automatically.
Thanks
Chris