Phillip
We have an interesting issue: we have a Master Project that contains links to
3 subprojects. But each subproject has linked tasks to other projects.
In PWA, when a user looks at the Master Project, they can see that the
sub-project is a linked project in the indicator column, BUT, the linked
tasks in that sub-project to another schedule does not have a linked task
indicator.
Is this possible with PS2007?
Thanks.
`P.
3 subprojects. But each subproject has linked tasks to other projects.
In PWA, when a user looks at the Master Project, they can see that the
sub-project is a linked project in the indicator column, BUT, the linked
tasks in that sub-project to another schedule does not have a linked task
indicator.
Is this possible with PS2007?
Thanks.