links between subtasks

C

carl

Is there a way to preserve the link display between subtasks when they are rolled into a summary task? The links disappear when the sub-tasks are rolled up. A current project has many (430 or so) short duration sub-tasks which are linked to other subtasks in the same and other summary tasks. For clarity I would like to be able to display the sub-task link even after it's rolled up into a summary task. Filtering for "Critcal" yeilds about 150 disparate critical tasks which are difficult to decifer even on "D-size" printouts.
 
B

BJ

There is no way to do this but hypothetically, how would you propose this
look? A bunch of lines into and out of a summary task at various points
doesn't seem like it would do much.


carl said:
Is there a way to preserve the link display between subtasks when they are
rolled into a summary task? The links disappear when the sub-tasks are
rolled up. A current project has many (430 or so) short duration sub-tasks
which are linked to other subtasks in the same and other summary tasks. For
clarity I would like to be able to display the sub-task link even after it's
rolled up into a summary task. Filtering for "Critcal" yeilds about 150
disparate critical tasks which are difficult to decifer even on "D-size"
printouts.
 
J

John

Carl,
I agree with BJ; I can't envision what a display of links in summary
task would be. However, to make a little more sense of the Critical task
filter, try sorting by Total Slack and then Start Date. It will show the
primary, secondary, etc. critical paths and help put things in
perspective.

Hope this helps.
John
 