C
Chanslor
Version: 2008
Operating System: Mac OS X 10.5 (Leopard)
Processor: intel
Email Client: Exchange
A suggestion and question related to the links function in Entourage:
1) The "Links" button should provide an in-menu list of selectable items instead of opening an entirely different window.
2) If a user is trying to link a message to a previously defined Task, the window that appears shows both Complete and Incomplete Tasks as possible link-able items. Is there a way for only Incomplete Tasks to be displayed inside of the Links window?
Great feature but quite cumbersome.
Operating System: Mac OS X 10.5 (Leopard)
Processor: intel
Email Client: Exchange
A suggestion and question related to the links function in Entourage:
1) The "Links" button should provide an in-menu list of selectable items instead of opening an entirely different window.
2) If a user is trying to link a message to a previously defined Task, the window that appears shows both Complete and Incomplete Tasks as possible link-able items. Is there a way for only Incomplete Tasks to be displayed inside of the Links window?
Great feature but quite cumbersome.