J
Jimmy D
I have a number of reporting graphs linked into a spreadsheet which I update
on a daily basis. I then need to adjust where the graphs read to include the
days data. This is tedious and time consuming with 16 graphs to adjust. Is
there a macro or something I could write that would adjust the data range
automatically in excel97?Adjustment could be based on a date easily enough.
on a daily basis. I then need to adjust where the graphs read to include the
days data. This is tedious and time consuming with 16 graphs to adjust. Is
there a macro or something I could write that would adjust the data range
automatically in excel97?Adjustment could be based on a date easily enough.