DJ Huff
MSP 2003 standalone. Have a master with 4 inserted (and linked) plans. All
(master and sub plans) have been baselined, all have same project status
date. The EV figures for the program summary of each sub plan (first line in
the master) are different than the project summary lines for each sub plan.
How is this possible?
From where does the project subplan summary lines in the master get its
figures?
(master and sub plans) have been baselined, all have same project status
date. The EV figures for the program summary of each sub plan (first line in
the master) are different than the project summary lines for each sub plan.
How is this possible?
From where does the project subplan summary lines in the master get its
figures?