R
Rasoul Khoshravan
I want to multiply two big matrices using mmult function.
The size of both matrices are 256*256. Each one is stored in a single sheet.
REsult will be stored in the third sheet.
I am wondering how much time it will take.
In the mean time I would to measure the time necessary for this
multiplication.
What is the best way to measure the calculation time? Is there any command
in Excel which can measure calculation time?
The size of both matrices are 256*256. Each one is stored in a single sheet.
REsult will be stored in the third sheet.
I am wondering how much time it will take.
In the mean time I would to measure the time necessary for this
multiplication.
What is the best way to measure the calculation time? Is there any command
in Excel which can measure calculation time?