S
sheriff
I would like to create a memo field. Is there a way to have the computer
insert a date automatically like the example below and some text to follow
would be entered by the user? This field would be an "comments" field that
would be added to every few weeks/days. This is a sample of the data in the
field (this would be based on only 1 report) and there would be many separate
reports to follow.
"5-Jan-2007: complete GRA packet received.
Note: Product registered and marketed in Italy and may be used as a supply
source for other markets in order to maximize use of XXX mfg. capacity.
15-Jan-2007: confirmed w/A. XXXX; report will only be prepared for the
XXXmarket.
16-Jan-2007: requested approved/signed data tables from XXX and XXX.
23-Feb-2007: requested formal written advisement from XXX(specific
requirements, intent of report, etc.)
23-Mar-2007: follow-up with XXX to verify if report is still required.
5-Apr-2007: will continue to f/u for reply from GRA. Report placed on HOLD
status until official notification from GRA to resume report.
18-Apr-2007: Received notification from XXX; report will be required.
Report taken off HOLD status and is currently inprocess.
31-May-2007: report submitted for final review (XXX)
19-June-2007: GRA requested to place the stability report on hold.
25-Jun-2007:
This report was commissioned as a part of the XXX project. The dossiers for
that project, however, will be prepared ussing a different process.
"
Or would I need a seperate date field for each comment? Thanks for any help
you can give.
insert a date automatically like the example below and some text to follow
would be entered by the user? This field would be an "comments" field that
would be added to every few weeks/days. This is a sample of the data in the
field (this would be based on only 1 report) and there would be many separate
reports to follow.
"5-Jan-2007: complete GRA packet received.
Note: Product registered and marketed in Italy and may be used as a supply
source for other markets in order to maximize use of XXX mfg. capacity.
15-Jan-2007: confirmed w/A. XXXX; report will only be prepared for the
XXXmarket.
16-Jan-2007: requested approved/signed data tables from XXX and XXX.
23-Feb-2007: requested formal written advisement from XXX(specific
requirements, intent of report, etc.)
23-Mar-2007: follow-up with XXX to verify if report is still required.
5-Apr-2007: will continue to f/u for reply from GRA. Report placed on HOLD
status until official notification from GRA to resume report.
18-Apr-2007: Received notification from XXX; report will be required.
Report taken off HOLD status and is currently inprocess.
31-May-2007: report submitted for final review (XXX)
19-June-2007: GRA requested to place the stability report on hold.
25-Jun-2007:
This report was commissioned as a part of the XXX project. The dossiers for
that project, however, will be prepared ussing a different process.
"
Or would I need a seperate date field for each comment? Thanks for any help
you can give.