Milestones on a timeline

T

tjcmills

Why is this so hard?

I want to resize my timeline so it is wider so multiple workstreams can be
added to it. However, when I do that the milestone re-size with the timeline
and become ridiculously large. Annoying.

Secondly and more infuriatingly, when I try and position milestones to
represent the workstreams (e.g. top workstream is sales team, middle one is
HR, etc.) the milestone is automatically 'snapped' back into position. I have
no control where on the timeline it is positioned (other than the date)...

It's all pretty lame.... I'm using Visio 2003

Thanks for your help...
 
P

Paul Herber

Why is this so hard?

I want to resize my timeline so it is wider so multiple workstreams can be
added to it. However, when I do that the milestone re-size with the timeline
and become ridiculously large. Annoying.

Use just one workstream per timeline.
 