Hi All!
We put MS EPM 2007 into "pre-production" .
At the time of 2 month wolrkload in "real-life" project enviroment (about 40
projects with 200 - 1500 tasks) the following bug sometimes occured:
- all task and resource local custom fields (text1-text30, number1-
number20, start.., finish..., flag.., duration... and so on) have been
unintentionally created and assigned to lookup table (value lists). It
occured with 3 projects of 40 after saving and publishing them to enterprise.
VBA code uses some custom fields (resource: number1-number3,
task:cost1-cost2) to store and calculate bussiness specific data.
Unpredictable assigning fields to lookup table (wich does not exist) caused
of loosing data in those fields.
Has anybody experinced the problem like above?
You suggestions and help are welcome !
We put MS EPM 2007 into "pre-production" .
At the time of 2 month wolrkload in "real-life" project enviroment (about 40
projects with 200 - 1500 tasks) the following bug sometimes occured:
- all task and resource local custom fields (text1-text30, number1-
number20, start.., finish..., flag.., duration... and so on) have been
unintentionally created and assigned to lookup table (value lists). It
occured with 3 projects of 40 after saving and publishing them to enterprise.
VBA code uses some custom fields (resource: number1-number3,
task:cost1-cost2) to store and calculate bussiness specific data.
Unpredictable assigning fields to lookup table (wich does not exist) caused
of loosing data in those fields.
Has anybody experinced the problem like above?
You suggestions and help are welcome !