MS Project 2007 Earned Value Report

P

PS

Hello,

I am trying to run an earned value report in MS Project 2007. In MS Project
2003, there was an anlalyze time scale data function that would generate a
time data report with a breakdown of tasks and the selected fields (i.e.
ACWP, BCWP, BCWS) and a graph with cost versus time in weeks (with the first
calendar date of each week on the x-axis of the graph). In MS Project 2007,
this analyze time scale data has seemed to disappeared and now there is a
View Reports function for Earned Value that exports a graph and a pivot
table. To display the break down of weeks from quarters, I think I have to
click on all the weeks that I want to be displayed on the graph using the
pivot table. I would like to see calendar dates corresponding to the weeks
like in MS Project 2003 (without having to change the level of usage data to
days in the Visual Reports window) and I would like to see the breakdown of
ACWP, BCWP, and BCWS for each task in the pivot table or in a report. Is
there a way I can do this in MS Project 2007? If so, how? Also, is there
some way I can still access the analyze time scale data function in MS
Project 2007 because I liked the time data report that was exported along
with the graph in 2003?

Thanks.
 