MS Project Links to Excel

G

GKatz

I have a WinXP Pro PC with SP1, MS Project 2002 & MS Office 2002.
I put links in the notes of a Project to specific cells of an Excel spreadsheet.
If I open the project and reply that I do not want to have the links updated it works fine and it can even follow the links.
If I open the project and reply that I want the links to be updated, it freezes as project takes 100% of the CPU time.

Please let me know if there is a way arround this.
 
J

JackD

I would work around it by not doing it.
Those sorts of links have been proven to be troublesome and unreliable since
Project 4.

-Jack



GKatz said:
I have a WinXP Pro PC with SP1, MS Project 2002 & MS Office 2002.
I put links in the notes of a Project to specific cells of an Excel spreadsheet.
If I open the project and reply that I do not want to have the links
updated it works fine and it can even follow the links.
If I open the project and reply that I want the links to be updated, it
freezes as project takes 100% of the CPU time.
 