MSP 2007 Known bugs/hotfixes.

J

Jay

For Project Client 2007

939595 PRJ2007 After checking resource information a project crash is soon
to happen

939595 PSVR2007 - Renaming projects breaks cross project links.

939595 PRJ2007 - Leveling does not correctly updated Finish date of tasks

939163 PRJ2007 - Adding values to outline codes shows linear performance
degradation, is significantly slower than P11

939162 PRJ2007 - Object Model does not allow the use of assignment
enterprise text fields.

938889 PRJ2007 - Migrated custom fields do not show changes when modified

938889 PRJ2007 - Cut and paste to indented task does not indent pasted task

938889 PRJ2007 - Project Professional sending parent-less assignments to
the system

938886 PRJ2007 - Incorrect code mask allows additional items to be entered.

938889 PRJ2007 : Outline codes are not indented in Grouping views

938189 PRJ2007 - Enterprise Custom Fields are not sorted in alphabetical
order

937907 PRJ2007 - Enterprise Outline Codes changes not saved when changed in
Project Information

937907 PRJ2007 - Projects remain in a "Checkin Pending" state

937907 PRJ2007 - Status manager field should not be saved with a template.

936517 PRJ2007: You cannot use the Fill Down feature for the Status Manager
field in templates.

935557 PRJ2007 Importing plans the import wizard doesn't automatically map
to the Enterprise Account



For Project Server 2007



939594 PSVR2007 : OLAP cube dimensions do not work (dpk already created)

939161 PSVR2007 - Reporting database does not contain the capacity value
for Generic Resources

938891 PSVR2007 - Assignments with Proposed Resources are published to PWA
and visible in My Tasks

937908 PSVR2007 - Use of local calendar results in variance between PWA and
Pro views

937908 PSVR2007 - Task Updates need improved visibility

PendingPSVR2007 homepage performance degrades with lots of risks or issues
(sometimes the page will timeout)

937908 PSVR2007 - DCR - My Tasks Page - Need Collapse Functionality

937908 PSVR2007 - Deny the ‘Create new Activity or Proposal’ global
permission causes an error in Build Team from Enterprise.

937908 PSVR2007: Users get 'An unexpected error has occurred' when
accessing the PWA homepage

937908 PSVR2007 -DCR- Task IDs are unavailable for My Work views.

937908 PSVR2007 -DCR- Task IDs are unavailable when creating new task in PWA.

937908 PSVR2007 -DCR- Unable to enter work estimate when creating new task
in PWA.

937908 PSVR2007 Can't change the owner of a project plan in PWA

937908 PRJSVR2007 Unable to link an issue to a task when the task number is
greater than 100

PendingPSVR2007 Syncing to WSS Root site can take up to what appears to be
48 hours

937908 PSVR2007 Drilling into Project from the Project Center can be slow

937908 PSVR2007 Cleanup of FAC feature from code base presence limits
scalability

937476 PSVR2007 CDCR: My Tasks page doesn't show a total before submitting
to the PM for approval

936876 PSVR2007 Using Export to Excel doesn't bring over all pertinent
information

936134 PSVR2007 : Timesheet totals don't display if you turn off the "The
timesheet will use standard Overtime and Non-Billable time tracking." options

936134 PSVR2007 Extreme waiting for common PSI calls when transferred data
is certain size
 
J

James Fraser

937908 PSVR2007 - Task Updates need improved visibility

Does anyone know anything about this particular line item? Is there an
addition to the reporting DB or something? The referenced KB article
doesn't mention this issue as fixed.


James Fraser
 
D

Dale Howard [MVP]

Jay --

Thanks so much for sharing this information. As you already know, people in
this newsgroup are so desperately craving SP1 to fix the many bugs we have
all seen in Project Server 2007. Unfortunately, the list of bugs documented
in the Hotfixes doesn't even begin to scratch the surface of the bugs that
are in this tool and need to be fixed! :)
 
J

Jonathan Sofer

FYI, I am starting to hear more and more that the release of SP1 will most
likely not occur until January or February of 2008.

Jonathan
 
J

Jay

Ok Dale dont laugh, but is there any published list to cross ref before
pulling hair out. :cool:

-Jay
 
D

Dale Howard [MVP]

Jay --

Believe me, I'm not laughing. This is a serious issue, and is becoming more
serious by the minute as more users implement Project Server 2007, only to
discover the many bugs. The best I can tell you is to go to the Knowledge
Base, and search for "hotfix" under either Project 2007 or Project Server
2007. That's how I do it, as the search should return all of the available
Hotfixes for either product.

You do have to make a call to Microsoft Support to obtain the Hotfixes, but
the call is free after you tell them you want the Hotfixes. Hope this
helps.
 
A

anovak

Ok Dale dont laugh, but is there any published list to cross ref before
pulling hair out. :cool:

-Jay

Hey the one that says 'Projects remain in a "Checkin' Pending'
State' - is this where you have to go in an delete the Cache folder on
the workstation? Does this one have a HotFix that fixes that?
 
A

anovak

Ok Dale dont laugh, but is there any published list to cross ref before
pulling hair out. :cool:

-Jay


Do all these KBs have an associated HotFix? I remember hearing
somewhere that sometimes the HotFixes themselves are far behind the KB
articles themselves. Please confirm.
 
A

anovak

Andy:

Typically, the hotfix is ready before the KB article. So if you see a KB
article that references a hotfix, it's available.

--

Gary L. Chefetz, MVP
MSProjectExperts
For Project Server Consulting:http://www.msprojectexperts.com
For Project Server FAQS:http://www.projectserverexperts.com

Let me reiterate my next to last ? if I may. KB937907 references
the error "Projects remain in a checkin pending state" Is this the
scenario where we've had to go in and delete the cache on the
workstation in the past to resolve or something else entirely?
 
G

Gary L. Chefetz [MVP]

Andy:

The KB claims to fix at least one issue that causes the behavior. Whether or
not it will solve some, most or all or your occurrences with all of your
users, can only be determined by applying the fix and reporting back the
results. I'm a lot less reluctant to apply hot fix therapy to the client
than the server, as reinstalling the client is not a big deal.

--

Gary L. Chefetz, MVP
MSProjectExperts
For Project Server Consulting: http://www.msprojectexperts.com
For Project Server FAQS: http://www.projectserverexperts.com
 
J

Jean-Paul

Hi there,

Do you have the link to the knowledge base and the list of hotfixes?

Thanks!
 