Multiple Resource Skill matching on PS 2007 ?

P

Patrizio

I create a generic resource with a specific skill, then I assign it to a task
with 500% units. In the Build Team from Enterprise tool, I click on Match and
I find the matching resources. I select 5 resources to substitute the generic
one, but the Replace button is grayed. Only if I choose 1 resource the
Replace button is available.
Is there any way to allow multiple resource matching/replacing ?
I think it's a bug, because if I replace only 1 resource then the task
duration will change according to the 100% resource availability.
 
D

Dale Howard [MVP]

Patrizio --

You cannot subsitute multiple resources for a single Generic resource. It
is not a bug; it is the way the tool is designed. Hope this helps.
 
P

Patrizio

Thank you Dale,
I understand that the tool is designed in this way, even if I think it
should be very useful to substitute generic resources with multiple named
resources.
 