J Ferguson
I have a need to create a duplicate copy of a production project server
instance. Backgorund: We have a server farm configuration with a Terminal
Server, Application Server and Database Server deployment. Two Project Server
instances are currently avaiable, one production instance and the other a
test are for proving out configuration changes before advancing them to
production.
What is needed its a process to copy/move/replicate/refresh the production
instance back to the test instance. Do you have any ideas, or process and
proceedure documented for achieving this task?
Thank you in advance for your assitance as this is somewhat a time critical
issue.
Version Project Server 2007 SP1
MS Project Professional 2007 Version12.0.6211.1000) SP1 MSO (12.0.6213.1000)
instance. Backgorund: We have a server farm configuration with a Terminal
Server, Application Server and Database Server deployment. Two Project Server
instances are currently avaiable, one production instance and the other a
test are for proving out configuration changes before advancing them to
production.
What is needed its a process to copy/move/replicate/refresh the production
instance back to the test instance. Do you have any ideas, or process and
proceedure documented for achieving this task?
Thank you in advance for your assitance as this is somewhat a time critical
issue.
Version Project Server 2007 SP1
MS Project Professional 2007 Version12.0.6211.1000) SP1 MSO (12.0.6213.1000)