O
O....
Thanks Guys.... One more question. Should I use a nested If or can I use
Else. If there's a date In (Range("D3").Value) I Want to take the Month of
"D3" / 12 * Range("G4").Value). Thanks
O......
Else. If there's a date In (Range("D3").Value) I Want to take the Month of
"D3" / 12 * Range("G4").Value). Thanks
O......