Astro Boy
I am looking high and low for a document which describes the data
found in the MOPS 2007 default OLAP cubes. I am having a heck of a
time trying to tell the difference between the data available in the
EPM Timesheet cube vs the MSP_Project_Timesheet cube vs. the Timesheet
cube. I am spinning cycles galore tossing fields into views, then
going back and trying to figure out just what it is I'm looking at.
Has anyone seen such a reference document anywhere?
Thanks!
AB