This is something that I have never had to do before so I dont even know
where to start.
My spreadsheet calculates linear feet of reinfircing steel based on criteria
that I enter. I have the formulas working thatnks to the great help of others
today.
Now I have a series of linear feet that I have to add to one total. However
if the length of reinforcing steel is greater than 20 feet you have to splice
it which adds about 4 feet to the bar lenght, but it is for EVERY 20 feet
incrment. So here is what I need.
If A1<20 then formula a
If A1>20 then formula+4 (But for every 20 foot increment)
Is this possible?
where to start.
My spreadsheet calculates linear feet of reinfircing steel based on criteria
that I enter. I have the formulas working thatnks to the great help of others
today.
Now I have a series of linear feet that I have to add to one total. However
if the length of reinforcing steel is greater than 20 feet you have to splice
it which adds about 4 feet to the bar lenght, but it is for EVERY 20 feet
incrment. So here is what I need.
If A1<20 then formula a
If A1>20 then formula+4 (But for every 20 foot increment)
Is this possible?