Hi,
I would like to open a project plan (published on MSProject Server) from
Excel.
I enabled the MS PRoject Librairy within Excel. I am able to open MSProject,
but just local not connected to the server.
I also tried to copy some code from MS Pro in Excel but it returns an error.
Code:
FileOpen Name:="<>\12199 CLA53-1 DEVADS LMIC System Shutdown.Published"
Errror :
Project cannot open the file
My guess is that I should have the server information between or in place of
<>. But I do not know the syntax.
Does anyone knows the syntax ?
Thanks.
I would like to open a project plan (published on MSProject Server) from
Excel.
I enabled the MS PRoject Librairy within Excel. I am able to open MSProject,
but just local not connected to the server.
I also tried to copy some code from MS Pro in Excel but it returns an error.
Code:
FileOpen Name:="<>\12199 CLA53-1 DEVADS LMIC System Shutdown.Published"
Errror :
Project cannot open the file
My guess is that I should have the server information between or in place of
<>. But I do not know the syntax.
Does anyone knows the syntax ?
Thanks.