S
Stuart
Hi,
This is a complicated and long request.
We are currently implementing a very large installation
that has about 6,000 projects and 8,500 resources. The
plans generally run between 2 and 20 years each.
Portfolio managers need to be able to organise their
plans and use filtering on the PWA and save these as
links. The amount of data becomes unmanageable without
these filters.
Additionally, because we are world-wide organisation, we
have the servers installed in Europe with users across
the globe. The networks are not fast enough on their own
and we run in a Citrix environment to allow for
reasonable response times.
My problems are:
1. We cannot open plans in Citrix from the PWA if we do
not have Project Professional installed on the desktop.
The Open icon does not appear in the web page.
2. If we do have project professional installed on the
desktop, the open goes to the desktop and not the Citrix
version. This happens even if we open plans directly
using Citrix.
3. If we collaborate from the Project area to the PWA
(trying to circumvent the above issue) then links
disappear and the list of plans becomes unmanageable (we
do not want to rebuild the links every time that we sign
in and out).
Can someone please help.
Thanks
Stuart
This is a complicated and long request.
We are currently implementing a very large installation
that has about 6,000 projects and 8,500 resources. The
plans generally run between 2 and 20 years each.
Portfolio managers need to be able to organise their
plans and use filtering on the PWA and save these as
links. The amount of data becomes unmanageable without
these filters.
Additionally, because we are world-wide organisation, we
have the servers installed in Europe with users across
the globe. The networks are not fast enough on their own
and we run in a Citrix environment to allow for
reasonable response times.
My problems are:
1. We cannot open plans in Citrix from the PWA if we do
not have Project Professional installed on the desktop.
The Open icon does not appear in the web page.
2. If we do have project professional installed on the
desktop, the open goes to the desktop and not the Citrix
version. This happens even if we open plans directly
using Citrix.
3. If we collaborate from the Project area to the PWA
(trying to circumvent the above issue) then links
disappear and the list of plans becomes unmanageable (we
do not want to rebuild the links every time that we sign
in and out).
Can someone please help.
Thanks
Stuart