K
KK
Hi There,
I am working on dynamically generating an org chart using Visio by
connecting to database. Using Visual basic and calling Visio’s runtime org
chart wizard (OrgCWiz) and generating the chart.
Every time it generates a top-down chart only. I need to generate the chart
using preset settings that drive the levels that will be shown top-down and
the levels that will be shown left-right.
Any ideas ?
Thanks.
KK
Do you have any thoughts on this?
Thanks,
KK
I am working on dynamically generating an org chart using Visio by
connecting to database. Using Visual basic and calling Visio’s runtime org
chart wizard (OrgCWiz) and generating the chart.
Every time it generates a top-down chart only. I need to generate the chart
using preset settings that drive the levels that will be shown top-down and
the levels that will be shown left-right.
Any ideas ?
Thanks.
KK
Do you have any thoughts on this?
Thanks,
KK