A
Adam Blumenthal
My company uses Lotus Notes, but I love Outlook. I have successfuly installed
the Conector for Lotus and everything works great except one thing:
When I create tasks and assign a category to them, the categories do not
stick. After some time (perhaps after each sync with the mail server) the
categories are removed and all my tasks are left uncategorized.
2 Questions:
1) can this be fixed
2) if not, can I create a keyboard shortcut to add a new task to a task list
that is separate from Lotus, and in another folder within this profile.
Thanks
the Conector for Lotus and everything works great except one thing:
When I create tasks and assign a category to them, the categories do not
stick. After some time (perhaps after each sync with the mail server) the
categories are removed and all my tasks are left uncategorized.
2 Questions:
1) can this be fixed
2) if not, can I create a keyboard shortcut to add a new task to a task list
that is separate from Lotus, and in another folder within this profile.
Thanks