I have a need to paste link dates from a 2000 Project
file to a 2002 Excel file. When I do the paste link it
brings over the entire task over to excel as an object.
I just want the date to appear in excel. Does anyone
know if this is possible?
file to a 2002 Excel file. When I do the paste link it
brings over the entire task over to excel as an object.
I just want the date to appear in excel. Does anyone
know if this is possible?