R
RobBrim
OK, I have been assigned the charge of sheduling 250+ patients in 5
physical therapy clinics. The system they were using before was a
centralized excel spreadsheet(by centralized I mean the patients were
not seperated by clinic but all lumped into one list, including the
patients that had stopped treatment meaning over 3000 patient entries).
I've changed it to one sheet for each clinic but I still need to keep
track of what studies were conducted for each patient what dates they
had follow up what days they had studies, the current method just
relists the patient once for each visit. Ultimately what I need is a
daily report/schedule with the clinic name its schedule for that day,
th ebody part the patient is being treated for and what studies the
patient has completed.. fortunately iys only 2 doctors but this is
fustrating. Anyolne have any idea of where I should even start?
physical therapy clinics. The system they were using before was a
centralized excel spreadsheet(by centralized I mean the patients were
not seperated by clinic but all lumped into one list, including the
patients that had stopped treatment meaning over 3000 patient entries).
I've changed it to one sheet for each clinic but I still need to keep
track of what studies were conducted for each patient what dates they
had follow up what days they had studies, the current method just
relists the patient once for each visit. Ultimately what I need is a
daily report/schedule with the clinic name its schedule for that day,
th ebody part the patient is being treated for and what studies the
patient has completed.. fortunately iys only 2 doctors but this is
fustrating. Anyolne have any idea of where I should even start?