I am running MP 2000 and have a project loaded that takes
approximately 1.5 hours and about 100 steps to complete.
The Gantt chart and Network diagrams seem to display
properly. All PERT toolbar icons are present in the Gantt
view and the name of the tool button pops up when you do a
mouse over. The problem is that none of the buttons do
anything when actuated. I am trying to enter the
pessimistic, expected and pessimistic durations for each
task buy I do not get a PERT entry sheet. Any ideas would
be appreciated as I am crunching my way through a program
that I have never used before. Thanks for reading . . . BCT
approximately 1.5 hours and about 100 steps to complete.
The Gantt chart and Network diagrams seem to display
properly. All PERT toolbar icons are present in the Gantt
view and the name of the tool button pops up when you do a
mouse over. The problem is that none of the buttons do
anything when actuated. I am trying to enter the
pessimistic, expected and pessimistic durations for each
task buy I do not get a PERT entry sheet. Any ideas would
be appreciated as I am crunching my way through a program
that I have never used before. Thanks for reading . . . BCT