S
Shah1398
My PIE chart is based on number of running hours.it is run through a query.is
there any method that i can specify the interval of graph by my self?becoz my
pie chart shows all the entries and it itself assign percentages to it.like
if there are running hours as 150,1200,1452,1354,541...and so on....then my
chart does not didvide them in specific interval of say...400 hrs,800 hrs,
1200 hrs...and neither it gives me option...or i cant find it atleast.
if not possible with the PIE CHART is there any other graphs which can give
me such options.
thanx.
regards.
shah.
there any method that i can specify the interval of graph by my self?becoz my
pie chart shows all the entries and it itself assign percentages to it.like
if there are running hours as 150,1200,1452,1354,541...and so on....then my
chart does not didvide them in specific interval of say...400 hrs,800 hrs,
1200 hrs...and neither it gives me option...or i cant find it atleast.
if not possible with the PIE CHART is there any other graphs which can give
me such options.
thanx.
regards.
shah.