J
Jeff C
I need to create a calculated field dividing the sum of one field by the
number of days in the month prior to the date in one of the data fields.
Mon PT
2/4/2008 26
I have tried =Sum(pt)/EOMonth(Mon,-1) and =Sum(pt)int(EOMonth(Mon,-1)) with
no results.
Is there a solution out there?
Thanks in advance
number of days in the month prior to the date in one of the data fields.
Mon PT
2/4/2008 26
I have tried =Sum(pt)/EOMonth(Mon,-1) and =Sum(pt)int(EOMonth(Mon,-1)) with
no results.
Is there a solution out there?
Thanks in advance