R
rajesh
Can anyone guide me in finding the calculation used for Planned Value. I mean
the tables/views and database fields accessed. I need to replicate the same
calculation logic in crystal report
thanks
the tables/views and database fields accessed. I need to replicate the same
calculation logic in crystal report
thanks