Hi,
I work with MS Project 2000.
Is there any possibility to create a hyperlink from a schedule to
another, namely to a specific process?
I know that it works like this: detailplan_meile.mpp#Balkendiagramm
(Gantt)!11
The problem is, that the link always points to row #11. If a process
is inserted before it, the link points to the process which was in row
#10 before.
Is there any solution? E.g. a possibility to access the process name
or the singular number with a hyperlink?
Greets Zabble
I work with MS Project 2000.
Is there any possibility to create a hyperlink from a schedule to
another, namely to a specific process?
I know that it works like this: detailplan_meile.mpp#Balkendiagramm
(Gantt)!11
The problem is, that the link always points to row #11. If a process
is inserted before it, the link points to the process which was in row
#10 before.
Is there any solution? E.g. a possibility to access the process name
or the singular number with a hyperlink?
Greets Zabble