A
alex
Hi Everyone,
I begin to configure portfolio 2007 (more time passed to finish it, I think
it’s done).
I add a gateway between portfolio 2007 and EPM 2007 but I don’t use it
really for now.
I just want to do each steps with minimal values and after fill datas.
Actually, I added 2 projects and configure all parameters: cost center, cost
drivers, users.
But after to finish to configure the builder, I used the optimizer and I
obtain an error.
I think this error stop the process of optimizing and no one solution can be
save.
That’s my scenario:
[THIS NEWSGROUP DOESN'T PERMIT TO ADD PICTURE AND MY ENTIRE PROCESS, SO YOU
CAN FIND THE ENTIRE PROCESS ON THE WEBPAGE BELOW HOSTING BY GOOGLE]
http://docs.google.com/Doc?id=dgq4sw2r_7fvhhdpgx
Best regards,
Alexandre
I begin to configure portfolio 2007 (more time passed to finish it, I think
it’s done).
I add a gateway between portfolio 2007 and EPM 2007 but I don’t use it
really for now.
I just want to do each steps with minimal values and after fill datas.
Actually, I added 2 projects and configure all parameters: cost center, cost
drivers, users.
But after to finish to configure the builder, I used the optimizer and I
obtain an error.
I think this error stop the process of optimizing and no one solution can be
save.
That’s my scenario:
[THIS NEWSGROUP DOESN'T PERMIT TO ADD PICTURE AND MY ENTIRE PROCESS, SO YOU
CAN FIND THE ENTIRE PROCESS ON THE WEBPAGE BELOW HOSTING BY GOOGLE]
http://docs.google.com/Doc?id=dgq4sw2r_7fvhhdpgx
Best regards,
Alexandre