N
nplm
I'm linking my org chart shapes to a database, so I'd like to be able to
refresh/update them all at once if I've made many changes to the excel
database.
When I do the normal "select all" and try updating, it thinks I want to
update EVERY SHAPE on the drawing (connectors, etc) and it gives me an error
window for EVERY shape.
I know I can manually select just the org chart positions by CTRL+clicking
each one. But is there a better way I can do this?
refresh/update them all at once if I've made many changes to the excel
database.
When I do the normal "select all" and try updating, it thinks I want to
update EVERY SHAPE on the drawing (connectors, etc) and it gives me an error
window for EVERY shape.
I know I can manually select just the org chart positions by CTRL+clicking
each one. But is there a better way I can do this?