M
mls123
I have encountered an apparent bug in Project 2000 that I
haven't seen any discussion on or a posted Microsoft fix.
I am rearranging a large project file and when I cut and
paste a task that has a large number of predecessors and
successors I find that Project changes the "type (ie FS,
SS)" of network link and the "lag" on a number of the
links.
I have to manually change them back to the correct links.
Has anyone else encountered this problem? It is very
annoying to work around. I downloaded the SR-1 patch but
it didn't fix the problem.
haven't seen any discussion on or a posted Microsoft fix.
I am rearranging a large project file and when I cut and
paste a task that has a large number of predecessors and
successors I find that Project changes the "type (ie FS,
SS)" of network link and the "lag" on a number of the
links.
I have to manually change them back to the correct links.
Has anyone else encountered this problem? It is very
annoying to work around. I downloaded the SR-1 patch but
it didn't fix the problem.