N
Nicolas
First, sorry about my poor english.
Now....I have a problem for a lot of time with Project Professional 2002 and
I could never solve it .... when I have opened more of a project, with
shared resources, generally I have to use the icons of ZOOM (in the graph of
gantt), but the problem is that in some occasions, once per day generally,
the computer stops!, or, does not answer more, and consequently all the
unprotected projects stay opened, and I have to be going to bother the
manager in order that he protects the projects again .... it without telling
that I have to realize all the work again .... did something similar happen
to someone?
Thank you!
Now....I have a problem for a lot of time with Project Professional 2002 and
I could never solve it .... when I have opened more of a project, with
shared resources, generally I have to use the icons of ZOOM (in the graph of
gantt), but the problem is that in some occasions, once per day generally,
the computer stops!, or, does not answer more, and consequently all the
unprotected projects stay opened, and I have to be going to bother the
manager in order that he protects the projects again .... it without telling
that I have to realize all the work again .... did something similar happen
to someone?
Thank you!