S
s.sanya
Actions:
1) at addition directly in SQL: dates, including dates of the finish and
start of a task are established, the attribute of a new task, an attribute of
is established that the project has been changed
2) at work through PDS to be specified the same attributes
as a result at loading plan MS Project of tasks are loaded as a milestone
with date which has been established as the end of task.
Parameters of a server:
- Winsdows Server 2003
- MSSQL 2000
- MS Project Server 2003 (SP2)
- as the client was always used MS Project 2003 SP2
1) at addition directly in SQL: dates, including dates of the finish and
start of a task are established, the attribute of a new task, an attribute of
is established that the project has been changed
2) at work through PDS to be specified the same attributes
as a result at loading plan MS Project of tasks are loaded as a milestone
with date which has been established as the end of task.
Parameters of a server:
- Winsdows Server 2003
- MSSQL 2000
- MS Project Server 2003 (SP2)
- as the client was always used MS Project 2003 SP2