Hi,
I rode the point.
I don't know if for you a group is like a team.
So to centralize the request about this point, i prefer to post here.
If it's not the good place, say me I post another request.
Context:
-Permit to use the self assign of task : ok by using the team pool and
assign at less one resource to the tasks.
-Permit to project manager to view availability by team1.
Issue:
Two resources are in the same Team Name : the Team1.
When I want to see the availability,
the capacity of each resources is going to 0 so how and is it possible to
define the calendar to associate to Team1.
If I don't associate the team to the two resources, the resource's calendar
is taken and the capacity is right.
In this link, I put pictures about the issue
http://docs.google.com/View?docid=dgq4sw2r_2055fzw34sc4
If you need more informations, don't hesitate.
I have two docs about using team in project but it's about the assignment
and the resource configuration, not the point described.
Best regards,
Alexandre BARAULT