Dear Community,

My problem is the following: On the Taskview / Cost Table, the Fixed Cost
rolls up correctly but the Total Cost rolls up all the fixed cost.

How do i stop the Total Cost from rolling up the Fixed Cost in Total Cost
Column?

Thank you for any help!
 
D

Dale Howard [MVP]

Alexandra --

You can't. Fixed Cost is a part of the total cost of the task. Please note
also that the Fixed Cost column does not roll up to summary tasks or to the
Project Summary Task (Row 0). This is because you might have a Fixed Cost
associated with a single task, an entire Phase or Deliverable section
(represented by a summary task), or an entire project. The system unlocks
all Fixed Cost cells for editing, therefore. Hope this helps.
 