A user of mine tried to add a new task to a project. Project came back and
said that a duplicate index would be created because of this addition. The
user cancelled adding the task and closed the project without saving. After
that the entire project plan disappeared. I have since recovered the project
from a backup but am wondering if this was a fluke error or if it was
actually caused by something that I should fix?
Thanks in advance
David