Is possible to get "project level" BCWP (EV) out of Portfolio Analyzer?
I can get BCWS by using Budgeted Cost (with an S-Curve).
I can get ACWP by using Actual Cost (with an S-Curve)
Is there anyway to get project level BCWP (Earned Value) out of Portfolio
Analyzer without having to extend the cube (as per "Project Server 2003:
Portfolio Analyzer OLAP Extensions")?
/Spiro Theopoulos