Project Summary Line

B

Brad Marriott

I am working in Project 2000 creating a project schedule with task that will
roll-up to a project summary line. The trouble I am having is with the text
showing on the summary line for more than one task with the same date. At
the summary level the task names are run together.

Is there a way to format the summary line so that the task names can be read
for each task when there is more than one task due on the same date?
 
J

John

Brad,
Not easily. It can probably be done but it will be very messy and the
row height of your task lines will grow very large. Unfortunately
Project's graphic capability isn't very flexible. I suggest you either
skip the idea or export the graphic to a more graphic intensive
application such as PowerPoint or Visio.

John
 