A
Andre
I am using proposed bookigs for several projects. The resource
availability view in PWA does not seem to work properly with this
feature. When unchecking the proposed booking box the graph still shows
the resource's work in the project that he has a proposed booking in.
It´s as if the planned work is not shown, but the resource's
availibility. At the same time, the red line showing the availability
of the resource disappears.
Is this a known bug, or am I doing something wrong.
BTW, the OLAP cube has been updated and for the time periods that this
concerns the resource availibility is als published.
André
availability view in PWA does not seem to work properly with this
feature. When unchecking the proposed booking box the graph still shows
the resource's work in the project that he has a proposed booking in.
It´s as if the planned work is not shown, but the resource's
availibility. At the same time, the red line showing the availability
of the resource disappears.
Is this a known bug, or am I doing something wrong.
BTW, the OLAP cube has been updated and for the time periods that this
concerns the resource availibility is als published.
André