I can add resources to a resource plan via build team, but i don't seem to be
able to edit/input the amount of work ... it shows 0 but i don't see anywhere
to change this.
For example, i have 'calc resource util from' set to Resource Plan and Work
Units to FTE.
I want to assign a particular FTE as 0.5 FTE on the Resource Plan for a 3
month period.
The right most column shows the 3 month time period, but 0 is presented as a
value. I don't seem to be able to edit or type over the 0 and replace it with
0.5. It's as if it is greyed out...
any ideas?
able to edit/input the amount of work ... it shows 0 but i don't see anywhere
to change this.
For example, i have 'calc resource util from' set to Resource Plan and Work
Units to FTE.
I want to assign a particular FTE as 0.5 FTE on the Resource Plan for a 3
month period.
The right most column shows the 3 month time period, but 0 is presented as a
value. I don't seem to be able to edit or type over the 0 and replace it with
0.5. It's as if it is greyed out...