T
TroyS
See if anyone else has other ideas...
Want to be able to:
1) have people update tasks via My Tasks on a project
2) Only have 1-2 PM's be able to view / open this project from PS07
I can create a new group and a new category, assign the 1-2PM's to this so
that only this one project is avaiable to view.
However that would mean i'd have to constantly move over all existing AND
all newly added projects within My Projects (Only these projects indicated)
except for the one i don't want the rest of the group in My Projects to see.
any other ideas? I'm trying to get around constantly moving new projects
added to Project Server in the My Projects category.
Want to be able to:
1) have people update tasks via My Tasks on a project
2) Only have 1-2 PM's be able to view / open this project from PS07
I can create a new group and a new category, assign the 1-2PM's to this so
that only this one project is avaiable to view.
However that would mean i'd have to constantly move over all existing AND
all newly added projects within My Projects (Only these projects indicated)
except for the one i don't want the rest of the group in My Projects to see.
any other ideas? I'm trying to get around constantly moving new projects
added to Project Server in the My Projects category.